Princess Royal Jetty: 
The Princess Royal Jetty was completed in 1994 and was constructed to meet an increasing demand for berths from vessels servicing the needs of the offshore oil and gas industry. The three berth jetty consists of a reinforced concrete deck supported on tubular steel piles. The berths, which are protected by Trellex Arch fendering, are serviced with fuel and water.

The two main berths, numbered 2 and 3 on the eastern side of the jetty, are operated by ASCo to complement its facilities at the South Base. These have a minimum water depth of 7 metres and can thus accommodate the larger North Sea oil support vessels.

The third berth, numbered 1, is operated by Peterhead Bay Authority. Along with 3,200 square metres of concrete surfaced storage area, it is available for the handling of bulk and general cargoes such as grain, fertiliser, peat and frozen fish.